Loom Prepared by: Inspected by: Date



Download 29.83 Kb.
View original pdf
Page1/3
Date12.06.2019
Size29.83 Kb.
  1   2   3


GOBELIN
LECLERC\INST\GOBELIN\LOOM.FRP
To assemble this loom, a minimum of 2 people are needed but it is recommended you use
3.
On receiving the loom, unpack and layout the loom components.
Do NOT discard any packing material until all parts are inventoried.
Check the parts received against the parts list. Report any discrepancies to Leclerc immediately.
Loom Prepared by _____________
Inspected by:__________________
Date:___________


B
C
D
E
A
Parts List:
A=
B=
C=
D=
E=
Loom end frames Leash heddle support
(161-GB)
8 Strengthening pieces
(154-BG)
2 Upper cross-members (note:
holes to fix Strength. pieces are under the piece, refer to the first page drawing Lower cross-members (note:
holes to fix strength. pieces are in the top of the wood piece. If the loom has a shaft kit, holes for treadle set are for front cross-member)
2 Warp beams (Gobelin and 45" have only one ratchet wheel per warp beam)
Page 2

Square nuts
Machine bolts



Share with your friends:
  1   2   3


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Harley Davidson
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha