Installation Manual for Buderus G115 Direct Vent Oil Boilers



Download 108.99 Kb.
View original pdf
Page9/25
Date06.01.2019
Size108.99 Kb.
1   ...   5   6   7   8   9   10   11   12   ...   25
3.

Select the point of wall penetration for the exhaust termination based on maintaining a minimum slope of ¼" per foot down towards the termination on the last horizontal pipe section. The wall termination assembly must also slope ¼" per foot down towards the outside. This allows possible condensate to drain from the venting system.
4.

Slope all other horizontal pipe runs ¼" per foot down towards the boiler vent connection. Fig. 3).
5.

Avoid any dips in the venting when using the flexible insulated stainless steel oil vent.
Never install a barometric damper into the exhaust piping. Minimum wall clearance (L1)needed for flex. Stainless Steel oil vent
24"

4" galvanized pipe
16" The Buderus G Direct Vent boiler system has been approved for use with two different intake/exhaust options. Follow the guidelines on pages 3 and 4 regarding termination placement. Option 1:


Separate air intake hood and aerocowl exhaust termination
Advise owner to keep intake and exhaust terminations free of debris and snow.
Burner settings
G115/21 riello bf



Share with your friends:
1   ...   5   6   7   8   9   10   11   12   ...   25


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha