Installation Manual for Buderus G115 Direct Vent Oil Boilers



Download 108.99 Kb.
View original pdf
Page7/25
Date06.01.2019
Size108.99 Kb.
1   2   3   4   5   6   7   8   9   10   ...   25
of vital importance to seal all flue joints and screw penetrations to prevent leakage of flue gases into the building. Pipe joints and other possible flue gas leakpaths should be sealed with high temperature silicone
(500 F rated silicone, GE. 106 or equivalent, or high temperature tape (360 F rated aluminum foil tape,
VentureTape CW or equivalent) as necessary. The venting system shall not be pierced under any circumstance after initial installation. Combustion measurements shall be performed at the exhaust termination and/or overfire. The breeching can be pierced for testing as long as the hole is sealed airtight with a bolt, washers and high temperature silicone.

Figure 2

1   2   3   4   5   6   7   8   9   10   ...   25


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha