Installation Manual for Buderus G115 Direct Vent Oil Boilers



Download 108.99 Kb.
View original pdf
Page5/25
Date06.01.2019
Size108.99 Kb.
1   2   3   4   5   6   7   8   9   ...   25
1.

The air intake must be placed on the same side of the building as the exhaust to balance wind pressure effects.
2.

The intake terminal must beat least 1 ft above maximum local snow level. An outside air intake riser is permitted provided a downturned intake terminal is used (Fig. 1).
3.

The intake and exhaust terminals must beat least 4 ft apart when using the Aerocowl exhaust termination. This minimum distance can be reduced to 2 ft when the intake terminal is at least 1 ft below the exhaust terminal.


Separate air intake hood and aerocowl exhaust termination
Advise owner to keep intake and exhaust terminations free of debris and snow.
Burner settings
G115/21 riello bf



Share with your friends:
1   2   3   4   5   6   7   8   9   ...   25


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Harley Davidson
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha