Installation Manual for Buderus G115 Direct Vent Oil Boilers



Download 108.99 Kb.
View original pdf
Page20/25
Date06.01.2019
Size108.99 Kb.
1   ...   17   18   19   20   21   22   23   24   25
Burner Settings
Always use instruments to check combustion.
DO NOT ADJUST BURNER OPERATION BY EYE
Necessary Equipment: CO analyser Draft gauge
Fuel pressure gauge
Stack thermometer Smoke tester
Overfire measurements should be made from the burner observation port located at the front of the boiler. Make sure when taking measurements that the airspace surrounding the pressure probe is completely blocked off with fiberglass or mineral wool.
Breeching measurements should betaken at the exhaust vent termination outside the building. The furnished burner is factory set for your Buderus boiler model and should require only minor adjustments. Install and set the burner per burner manufacturer's instructions. Table 2: Preliminary burner settings Boiler Model Burner Model Nozzle Air Band Set Head Set Press. psi) Blast Tube Insertion Stack Temp


Separate air intake hood and aerocowl exhaust termination
Advise owner to keep intake and exhaust terminations free of debris and snow.
G115/21 riello bf



Share with your friends:
1   ...   17   18   19   20   21   22   23   24   25


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Harley Davidson
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha