Installation Manual for Buderus G115 Direct Vent Oil Boilers



Download 108.99 Kb.
View original pdf
Page2/25
Date06.01.2019
Size108.99 Kb.
1   2   3   4   5   6   7   8   9   ...   25

Table of Contents
Notice: This version Nr. BHSG115DV-7 4/04 supersedes all previous manuals. Buderus
Hydronic Systems Inc. reserves the right to make changes without notice due to continuing engineering and technological improvements.


2 The location of the wall terminations is one of the most important aspects of a direct-vent installation. Both the intake and exhaust terminations must be located on the same outside wall in order to balance wind pressure effects against the flow of exhaust gases. In addition, the wall terminations shall not be installed on that side of the building exposed to the prevailing wind direction or in alcoves and exterior building recesses where swirling wind conditions may occur.
IMPORTANT: Consult with local authorities to insure compliance with local building, plumbing and electrical codes. Guidelines For The Location Of The Exhaust Termination.
See Figure 2 for details.


Separate air intake hood and aerocowl exhaust termination
Advise owner to keep intake and exhaust terminations free of debris and snow.
Burner settings
G115/21 riello bf



Share with your friends:
1   2   3   4   5   6   7   8   9   ...   25


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha