Installation Manual for Buderus G115 Direct Vent Oil Boilers



Download 108.99 Kb.
View original pdf
Page17/25
Date06.01.2019
Size108.99 Kb.
1   ...   13   14   15   16   17   18   19   20   ...   25
2.

Install a 4" air supply pipe from the intake terminal to the air intake boot on the burner. Galvanized pipe (4") or flexible 4" metal piping can be used. Use minimum number of elbows and keep the total pipe length to a minimum. Properly support pipe sections every 4 feet with a hanger or bracket. The installation must comply with all local codes and authorities having jurisdiction.
Note: In climates where the outside air temperature drops below -20 Fit is recommended to have a minimum of 6 to 8 ft of 4” diameter metal pipe in conditioned (warm) space to prevent cold combustion air from causing fuel gelling problems. A vacuum relief breaker on the air intake side can also be used to draw in some conditioned combustion air.


Separate air intake hood and aerocowl exhaust termination
Advise owner to keep intake and exhaust terminations free of debris and snow.
Burner settings
G115/21 riello bf



Share with your friends:
1   ...   13   14   15   16   17   18   19   20   ...   25


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Harley Davidson
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha