Installation Manual for Buderus G115 Direct Vent Oil Boilers



Download 108.99 Kb.
View original pdf
Page15/25
Date06.01.2019
Size108.99 Kb.
1   ...   11   12   13   14   15   16   17   18   ...   25
4.

Apply a ¼" wide bead of high temperature silicone all around at the 5" x 4" boiler reducer and wall termination connection. Slide adaptors on reducer and wall termination pipe all the way. Tighten with clamps.
5.

Support the flexible vent pipe at regular intervals with brackets or hangers. Maintain arise per foot on horizontal runs. Avoid any sag in the vent. Do not bend pipe excessively.
NOTE: Wrap 3" ceramic insulation around adaptor near termination and secure with sheet metal or foil tape and hose clamps to maintain 1" clearance. Installation of Galvanized Vent Pipe.


Separate air intake hood and aerocowl exhaust termination
Advise owner to keep intake and exhaust terminations free of debris and snow.
Burner settings
G115/21 riello bf



Share with your friends:
1   ...   11   12   13   14   15   16   17   18   ...   25


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Harley Davidson
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha