Installation Manual for Buderus G115 Direct Vent Oil Boilers



Download 108.99 Kb.
View original pdf
Page14/25
Date06.01.2019
Size108.99 Kb.
1   ...   10   11   12   13   14   15   16   17   ...   25
1.

Apply a ¼" wide bead of high temperature silicone all around the boiler vent connection 1" from the end. Install 5" to 4" reducer on boiler vent connection. Secure properly with a clamp.
2.

Carefully measure the required length of vent pipe and cut with a hacksaw. Allow for the two end adapters in your measurement.
3.

Apply a small bead of silicone to the outside of the oil vent ends. Twist end adaptors to each end of the oil vent. Turn adaptors counterclockwise. Engage the outer cover of the adaptor evenly over the exterior of the vent pipe. Turn the adaptor until the vent pipe interior seats evenly against the expanded teflon gasket of the end connector. Secure adaptors to the vent pipe with the provided clamps.


Separate air intake hood and aerocowl exhaust termination
Advise owner to keep intake and exhaust terminations free of debris and snow.
Burner settings
G115/21 riello bf



Share with your friends:
1   ...   10   11   12   13   14   15   16   17   ...   25


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha