Installation Manual for Buderus G115 Direct Vent Oil Boilers



Download 108.99 Kb.
View original pdf
Page12/25
Date06.01.2019
Size108.99 Kb.
1   ...   8   9   10   11   12   13   14   15   ...   25
    Navigate this page:
  • NOTE

NOTE: Use only the approved materials listed on the previous page for direct venting of oil-fired
Buderus G boilers. Use of any other materials, or systems not installed in accordance with the instructions contained in this manual will void the ITS listing.

NOTE: Use strictly high temperature rated silicone (500 F rated silicone, GE. 106 or equivalent) and/or high temperature tape (360º F rated aluminum foil tape) for sealing at all exhaust pipe joints. Check all seams and joints of the exhaust venting for gas tightness.
NOTE: Maintain clearances to combustibles as indicated in Table 1.

Table 1: Boiler and exhaust vent pipe clearances to combustibles Front Side Rear Top
Galv. Pipe
Insul. Oil Vent
24" 6" 6" 6" 18" 1" Option 1: Aerocowl termination. Option 2: Concentric termination. Figure 4: Exhaust termination options. Option 1: Installation of the Aerocowl termination.


Separate air intake hood and aerocowl exhaust termination
Advise owner to keep intake and exhaust terminations free of debris and snow.
Burner settings
G115/21 riello bf



Share with your friends:
1   ...   8   9   10   11   12   13   14   15   ...   25


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha