Topic No. 675-000-000 Materials Manual Effective May 16, 2002 Quality Assurance Revised October 16, 2016 Quality Control Program
5-6-1
Section 5.6
QUALITY CONTROL PROGRAM
5.6.1
PURPOSE This document describes activities for personnel who are involved with the Florida Department of
Transportation’s
(FDOT) Quality Control (QC) Program, which establishes quality control and process control standards for production and construction operations. The QC Program requires producers and contractors to have an accepted quality control plan and may also require an accreditation or certification to ensure compliance with industry standards. Other requirements for certain materials maybe described in other sections of this Manual. If no additional requirements exist, then the requirements of this section should be used to administer the Producer QC Program. If other requirements exist, they are to be applied in addition to these requirements. Requirements for administering the Contractor Quality Control Program are described in the Construction Project Administration Manual Section 3.3.


Authority sections a) and 334.048(3) florida statutes 5.6.3
District materials office responsibilities
State materials office responsibilities
Documents submitted to the materials office
Structural steel fabrication facilities:
Fiber reinforced polymer producers:
Al-0999 cementitious materials cement cmt
Qualification status codes for quality control plans
Material checklists
Facility is suspended
Control program



Share with your friends:
  1   2   3   4   5   6   7   8   9   ...   15


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
Xperia
yamaha