Fdot: State Materials Office Materials Manual Section 4 Clean



Download 224.57 Kb.
View original pdf
Page1/9
Date09.08.2018
Size224.57 Kb.
  1   2   3   4   5   6   7   8   9

Topic No 675-000-000 Materials Manual Effective March 1, 2000 Quality Assurance Revised February 1, 2018 Final Project Material Certification
5-4-1
Section 5.4

FINAL PROJECT MATERIAL CERTIFICATION

5.4.1
PURPOSE
To describe the Material Certification process requirements.
5.4.2
AUTHORITY
Sections 334.044(2), 334.044(10) (a) and 334.048 Florida Statutes
5.4.3
SCOPE
Offices affected by this procedure include the State Materials Office (SMO), State Construction Office (SCO) District Construction Offices (DCOs) and District Materials and Research Offices (DMROs).
5.4.4
REFERENCES
FEDERAL-AID POLICY GUIDE (FAPG), 23CFR, Subchapter G - Engineering and Traffic Operations, Part 637 - Construction Inspection and Approval,
Subpart B - Quality Assurance Procedures for Construction


General information
Required documents
Material acceptance
Exceptions to certification
Specifications section 105



Share with your friends:
  1   2   3   4   5   6   7   8   9


The database is protected by copyright ©userg.info 2017
send message

    Main page

bosch
camera
chevrolet
epson
fiat
Honda
iphone
mitsubishi
nissan
Panasonic
Sony
volvo
xiaomi
yamaha